Showing posts with label Waste Recycle. Show all posts
Showing posts with label Waste Recycle. Show all posts
Tuesday, 29 July 2014
Sunday, 27 April 2014
Plant at Sapling or Donate a Toy
April 27, 2014
No comments
You are invited to a small cause function:
Agenda:
launch of a Free "Sports and Games activity Club" for Children from Less Privileged Background.
Small Sapling plantation drive (planting 50 saplings of plants).
Date: May 1st, 2014
Time: 10:30 am to 12:30 pm
Location: Joseph Patel Wadi, After Versova Welfare School, on Fisheries Lane, Seven Bunglows, Andheri West.
Contacts: Asif - 9619182010 / Lopa - 9821694994
Details:
Sports club will be part of Trishul Learning Centre. A free activity based learning centre for Kids at Joseph Patel Wadi.
Beneficiaries will be Children between the age group of 7 year old to 14 years old.
Games and Activities:
Badminton
Volley Ball
Cricket
Football
Carom
Common Board Games / Puzzles
Toy Library etc.
Sapling Plantation
We are creating a Small Organic Plant Nursery also would also like to encourage local community to participate in the same. Sapling plantation will become part of waste recycle project "From Garbage to Garden".
We invited you to join us for the project activity referred above.
How you may help?
By being present as a volunteer on May 1st for the activity (10:30 am to 12:30 pm).
and/or
By getting any of the saplings mentioned below or we can buy the sapling on your behalf. Cost for each sapling would be Rs.100/-
and/or
Contributing any of the sports / games / activity items for the Sports Club above.
SAPLINGS PREFERRED.
Kadipatta
Tulsi
Lemon Grass
Lemon
Neem
Vegetable Climbers
Gogan Villa for the borders
or similar saplings of your choice.
Sunday, 13 April 2014
From Waste to Garden Campaign to Create Garden May 1st 2014
April 13, 2014
No comments
Sapling Plantation and awareness Campaign
Objective: To create a self Sustainable Nursery for Organic Plants and Waste Recycle Unit.
Date: May 1st 2014.
Timings: 10:30 am to 12:00 pm.
Location: Josep Patel Wadi,Seven Bunglows, Andheri West, 5 minutes walk from Versova Welfare School along same lane (Map given at bottom of page).
Scope of Campaign: May 1st, 2014. We plan to plant around 40 to 50 Saplings’ on this date. These saplings would be of Herbs and Plants like (Tulsi; Lemon Tea Grass; Vegetable Climbers like (beans, Mayalu etc); Curry Leaves (Kadi Patta) etc). Flowering shrubs (selected shrubs the flowers that can be used in Puja).
Support Required: Volunteers; Saplings of plants requested above; Snack / Water for the volunteers.
Timings: 10:30 am to 12:00 pm.
Location: Josep Patel Wadi,Seven Bunglows, Andheri West, 5 minutes walk from Versova Welfare School along same lane (Map given at bottom of page).
Support Required: Volunteers; Saplings of plants requested above; Snack / Water for the volunteers.
We plan to create a Plant Nursery at Waste Recycle site located at Joseph Patel Wadi; Near Seven Bunglows. This Garden would be created with support of local residents living at Josep Patel Wadi strongly supported by Children's group who are part of "Trishul Learning Centre", Women Empowerment Cell at "Trishul Learning Centre" and Local Youth from Joseph Patel Wadi. Any individuals interested in supporting the cause of Waste Recycle cause are welcome to support the campaign.
We will also seek support from Local Ward BMC; and other NGOs working in neighboring area;
Contacts to register as volunteer or for contributions:
M. Asif - 9619182010 / Lopa 9821694994
Contacts to register as volunteer or for contributions:
M. Asif - 9619182010 / Lopa 9821694994
The Nursery garden will have plants like vegetables (climbers); Herbs; Shrubs; beside flower plants. We plan to involve Children and Women from Trishul Learning Centre (Children’s wing and Women Empowerment Wing) to start participate in the project. These Women and Children are from local slum, hence will encourage active local voluntary participation. We plan to use the compost generated at site to build the Nursery and Vegetable Garden at the site. These vegetables; Nursery Plants and flower plant will be used for captive consumption and/or also available for commercial sale.
Maximum capacity of waste that can be collected at the waste recycle site is: 500 KGs per week or 2 Tons per month.
Monday, 20 January 2014
SCMM 2014 - Trishul Participation
January 20, 2014
No comments
![]() |
Subhash Rahane |
A Special note of Thanks to Mr. Gautam Das for continuous support our cause and encouragement to Trishul Team.
We will put up the entire list shortly.
A Big thanks to Unitedway of Mumbai for supporting TRISHUL.
![]() |
Smita Mani |
![]() |
Nitin Gera |
![]() |
Sanjeev Moge |
![]() |
Sayandev Chakravorty |
![]() |
Vikas Mahajan |
We will add other pictures as we receive them.
List of participants who supported us below.
Annasaheb Rahane
|
Subhash Rahane
|
Veena Sangli
|
Rajesh Kahar
|
Sayandev Chakravorty
|
Venkateswaran Lakshminarayanan
|
Smita Manoj Mani
|
Vikas Mahajan
|
Nitin Gera
|
Roli Gupta
|
Badrinivas Chakravarthy
|
Varun Bhardwaj
|
Gaurav Jalota
|
Ram Goenka
|
Brajesh Tiwari
|
Sanjeev Moghe
|
Abhijit Shah
|
Amol Mahadik
|
Sailaja Konda
|
Vasudeva Konda
|
Wednesday, 13 November 2013
Sunday, 3 November 2013
Friday, 1 November 2013
Wednesday, 9 October 2013
Composting routine work start
October 09, 2013
No comments
October 10, 2013
Project: Waste Recycle with Community Participation
Location: Joseph Patel Wadi. Andheri West, Mumbai
Most equipment and tools required for basic composting work have been procured, routine composting work to start today.
Activities
Clearing area for first dump
Getting pre-segregated waste collected
Cleaning and further segregating the waste into dry and wet
Preparing compos-table wet waste for composting
Adding magic powder
Fogging the compost
(twice a day or on need basis.. just make sure it is moist)
not too wet otherwise it will give a stink.
Repeat of rotation every 4 days
The compost temperature will rise
Compost will be ready in 30 to 40 days depending upon few conditions
Harvest the compost into Ventilated Compost Bins
Keep the compost till the temperature of compost is normal room temperature
What a day...! That was fun and lot of feel good factor.
Project: Waste Recycle with Community Participation
Location: Joseph Patel Wadi. Andheri West, Mumbai
Most equipment and tools required for basic composting work have been procured, routine composting work to start today.
Activities
Clearing area for first dump
Getting pre-segregated waste collected
Cleaning and further segregating the waste into dry and wet
Preparing compos-table wet waste for composting
Adding magic powder
Fogging the compost
(twice a day or on need basis.. just make sure it is moist)
not too wet otherwise it will give a stink.
Repeat of rotation every 4 days
The compost temperature will rise
Compost will be ready in 30 to 40 days depending upon few conditions
Harvest the compost into Ventilated Compost Bins
Keep the compost till the temperature of compost is normal room temperature
What a day...! That was fun and lot of feel good factor.
![]() |
Clearing the area for first dump |
![]() |
Weighing pre-segregated waste collected |
![]() |
Accumulating waste got from different places |
![]() |
One of the waste dumps collected from locality temple |
![]() |
Cleaning the waste |
![]() |
Dry Waste Removed 1 (Plastic, Decoration material from garlands) |
![]() |
Dry Waste Removed (Plastic, Bottles, Scrap metal 2) |
![]() |
Clean Dump that can be decomposed |
![]() |
Magic Potion.. for the compost |
Subscribe to:
Posts (Atom)